 |
|
 |
 |
|
|
|
|
|
|
Have you ever wondered how a crankup tower is installed? Many guys do, so we thought we'd show how one ham installed his US Tower TX-455. The photos shown below were taken at different stages during construction of the concrete base assembly.
|
|
|
|
|
|
The hole for the base footing dug
and framed.
|
|
|
From this view you can see the reinforcing bar and coax conduits.
|
|
 |
 |
|
|
The US Tower T-Base all set up and ready for the concrete pour.
|
|
A concrete truck sure makes the pour easy!
|
|
|
 |
 |
|
|
The footing hole with 3,000 pound concrete mix poured.
|
|
The adjustable T-Base can be levelled and plumbed in case of settling.
|
|
|
 |
 |
|
|
Another shot of the footing, ready for finishing.
|
|
Look Ma, no more forms! The finished footing shown without the T-Base.
|
|
|
 |
 |
|
|
The tower was picked up at the freight depot on a car carrier.
|
|
Here the tower is carefully moved with the help of a front end loader.
|
|
|
 |
 |
|
|
Stayed tuned for more...
|
|
|
|
|
Online Catalog Top Back Home
|
|
|
|
|
|
|
|
|
|
|
|